Herzog & de Meuron
Competition
2002

211_MO_0205_042a

211_MO_0205_042a

Process

Site analysis and master plan for a new music and arts center at the intersection of two main axes in the heart of Vitoria. The construction of the new high-speed railway provides an opportunity to redevelop the site of the old tracks and to upgrade it with fine buildings. Various promenades meet at this nexus.

211_SI_0205_502_ESQUEMA

211_SI_0205_502_ESQUEMA

211_RF_0000_TRIANAS0

211_RF_0000_TRIANAS0

The solitaire is conceived as an agglomerated cube, reminiscent of the old Festspielhaus in Bayreuth.

211_MO_0206_578_039-MOb.JPG

211_MO_0206_578_039-MOb.JPG

211_MO_0205_027b

211_MO_0205_027b

Developing the basic shape as an additive cruciform of cubes in both its ground plan and section.

211_MO_0205_507_K

211_MO_0205_507_K

211_MO_0205_508_K

211_MO_0205_508_K

211_MO_0205_042a

211_MO_0205_042a

211_MO_0205_503_K

211_MO_0205_503_K

211_MO_0205_509_K

211_MO_0205_509_K

211_MO_0205_512_K

211_MO_0205_512_K

211_MO_0205_526_K

211_MO_0205_526_K

Spaces for supporting functions surround the central stage space.

211_MO_0206_552_K

211_MO_0206_552_K

211_MO_0205_025b_K

211_MO_0205_025b_K

In the model, public function rooms are added to the central cruciform with its stage facilities, consolidating the whole into a cube.

211_MO_0206_406

211_MO_0206_406

211_MO_0206_419

211_MO_0206_419

The new music theater, a solitaire, serves as an anchor for the architectural future of the city, an orientation point for public and private projects.

211_DR_0206_503

211_DR_0206_503

211_PA_0206_FLOORPLANS-Set

211_PA_0206_FLOORPLANS-Set

211_DR_0206_501

211_DR_0206_501

211_MO_0206_586_045-MOb

211_MO_0206_586_045-MOb

211_CI_0206_501_K

211_CI_0206_501_K

Drawings

211_DR_200206_1-700_3RD_FLOOR-01

211_DR_200206_1-700_3RD_FLOOR-01

211_DR_200206_1-700_4TH_FLOOR-01

211_DR_200206_1-700_4TH_FLOOR-01

211_DR_190830_1-700_SECTION_S1-01

211_DR_190830_1-700_SECTION_S1-01

211_DR_190612_1-700_SECTION_S2-01

211_DR_190612_1-700_SECTION_S2-01

Team

Facts

Client
Ensanche 21 Zabalgunea, Vitoria, Spain
Planning
Structural Engineering: WGG Schnetzer Puskas Ingenieure, Basel, Switzerland
Specialist / Consulting
Acoustic Consulting: Estudi Acustic H. Arau, Barcelona, Spain
Scenography Consulting: Ducks Scéno Vaulx-en-Velin, France
Theater Equiptment: Chemtrol Division Teatro SA, Madrid, Spain
Building Data
Site Area: 91'493 sqft, 8'500 sqm
Gross floor area (GFA): 188'368 sqft, 17'500 sqm
Number of levels: 9
Footprint: 21'527 sqft, 2'000 sqm
Length: 219 ft, 67 m
Width: 164 ft, 50 m
Height: 167 ft, 51 m

Bibliography

Gerhard Mack, Herzog & de Meuron: “Herzog & de Meuron 2002-2004. The Complete Works. Volume 5.” BirkhĂ€user, 2020.

Preparing print view