Herzog & de Meuron Basel Ltd.
Rheinschanze 6
4056 Basel, Switzerland
Email: info@herzogdemeuron.com
Phone: +41 61 385 5757
Project Update
11 May 2025
LONDON, UK – Twenty-five years ago, the Tate Modern opened for the first time to the public. On the occasion of the original opening, we shared a text, excerpted here:
“It is exciting for us to deal with existing structures because the attendant constraints demand a very different kind of creative energy. In the future this will be an increasingly important issue in European cities. You cannot always start from scratch. We think this is the challenge of the Tate Modern as a hybrid of tradition, Art Deco and super modernism: it is a contemporary building, a building for everybody, a building of the 21st century.
And when you don’t start from scratch, you need specific architectural strategies that are not primarily motivated by taste or stylistic preferences. Such preferences tend to exclude rather than include something. Our strategy was to accept the physical power of Bankside’s massive mountain-like brick building and to even enhance it rather than breaking it or trying to diminish it.
This is a kind of Aikido strategy where you use your enemy’s energy for your own purposes. Instead of fighting it you take all the energy and shape it in an unexpected and new way.”
Artwork: Cecilia Vicuña, Brain Forest Quipu, 2022