Herzog & de Meuron
Competition
2017
Project
2017—2025

480_CP_250717_0841_MME_H_PRI

480_CP_250717_0841_MME_H_PRI

480_CP_250822_0812_MME_H_PRI

480_CP_250822_0812_MME_H_PRI

480_CP_250718_1541_MME_H_PRI

480_CP_250718_1541_MME_H_PRI

480_CP_250822_1029_MME_H_PRI

480_CP_250822_1029_MME_H_PRI

480_CP_250729_0817_H_PRI

480_CP_250729_0817_H_PRI

480_CP_250729_0829_H_PRI

480_CP_250729_0829_H_PRI

480_CP_250822_0801_MME_H_PRI

480_CP_250822_0801_MME_H_PRI

480_CP_250822_0831_MME_H_PRI

480_CP_250822_0831_MME_H_PRI

480_CP_250822_1429_MME_H_PRI

480_CP_250822_1429_MME_H_PRI

480_CP_250822_1423_MME_H_PRI

480_CP_250822_1423_MME_H_PRI

480_CP_250822_1551_MME_H_PRI

480_CP_250822_1551_MME_H_PRI

480_CP_250822_1505_MME_H_PRI

480_CP_250822_1505_MME_H_PRI

480_CP_250822_1032_MME_H_PRI

480_CP_250822_1032_MME_H_PRI

480_CP_250822_1122_MME_H_PRI

480_CP_250822_1122_MME_H_PRI

480_CP_250718_1118_MME_H_PRI

480_CP_250718_1118_MME_H_PRI

Process

In 2017, Lombard Odier announced H&dM as the winner of a competition between eight local and international architectural firms. Our project was selected for its “ultra-contemporary architecture that combines openness to its surroundings with elegance and innovation.”

480_CI_190213_TOI_Luftbild_roof-experience

480_CI_190213_TOI_Luftbild_roof-experience

480_CP_250729_0817_H_PRI

480_CP_250729_0817_H_PRI

480_MO_210429_Still-from-COMPETITION-CLIP_Auditorium

The site has exposure to the grand paysage genevois (Geneva’s grand landscape) while providing excellent connectivity: just a six-minute train ride from Geneva’s Cornavin station, five minutes by car from the airport, and convenient access to the motorway.

480_CI_171121_023_LBS_R1-911689

480_CI_171121_023_LBS_R1-911689

480_SI_190823_Site_One-Roof

480_SI_190823_Site_One-Roof

The building takes its place within the Champ-du-Chateau masterplan. Rather than following the suggested L-shaped configuration, we created a single curved building. This distinctive shape emerged by tracing the site’s outer boundaries to maximize the buildable area.

480_SI_141103_PLQ_1-100

480_SI_141103_PLQ_1-100

480_REP_180831_Parcelle

480_REP_180831_Parcelle

480_DG_181123_Site-Building-Regulations

480_DG_181123_Site-Building-Regulations

480_MO_190314_1-200_Detail_4

480_MO_190314_1-200_Detail_4

480_DG_1906_AXO

480_DG_1906_AXO

The building is characterized by thin, curved slabs that cantilever out, providing sun shading for the fully glazed façades and offering covered outdoor spaces all around the structure. The curves are not always superimposed, the contours vary, and the terraces differ in orientation and size according to adjacent programs.

480_SK_1706_004_JH

480_SK_1706_004_JH

480_MO_171012_1-200_Study_models_overview_017

480_MO_171012_1-200_Study_models_overview_017

480_MO_170823_JH_PdM_Meeting_007

480_MO_170823_JH_PdM_Meeting_007

480_MO_171021_037

480_MO_171021_037

480_MO_171021_034

480_MO_171021_034

480_MO_171021_030

480_MO_171021_030

The façades are treated identically, with no distinct front or back. Everything seems to float in a forest of white columns. The transparent, open building, with its fully glazed façades, maximizes the perception of le Grand Paysage – the lake, the mountains, and the green surroundings.

480_CP_250822_0831_MME_H_PRI

480_CP_250822_0831_MME_H_PRI

480_CP_250822_1035_MME_H

480_CP_250822_1035_MME_H

480_CP_250822_1722_MME_H

480_CP_250822_1722_MME_H

480_EV_201028_Mockup_Visite-Personne_10

480_EV_201028_Mockup_Visite-Personne_10

480_EV_210526_Mockup-Site_11

480_EV_210526_Mockup-Site_11

480_MU_201027_Mock-Up_IMG_0895

480_MU_201027_Mock-Up_IMG_0895

At the building’s core, an atrium splits open the ceiling, creating a central void that allows daylight to penetrate deep into the heart of the building.

480_MO_1803_003-MOc

480_MO_1803_003-MOc

480_EV_180812_PDM_Slab_Foyer_001

480_EV_180812_PDM_Slab_Foyer_001

480_CO_211215_Site-Team_visit_CHB-Handy_9

480_CO_211215_Site-Team_visit_CHB-Handy_9

480_CO_230821_Site10

480_CO_230821_Site10

480_CP_250822_1423_MME_H_PRI

480_CP_250822_1423_MME_H_PRI

480_CP_250822_1551_MME_H_PRI

480_CP_250822_1551_MME_H_PRI

The inner topography of One Roof creates an environment where people naturally connect through purposefully designed spaces beyond traditional work areas. From double-height collaborative zones to the ground-floor bistro, terrace cafeteria, and snack corners, these varied settings foster both casual and formal interactions throughout the day. The building also nurtures well-being through dedicated fitness area, alongside gardens that provide moments of respite.

480_DR_220708_Axo-04

480_DR_220708_Axo-04

480_CI_230307_ESC_Big-Axo-Furniture_for_Wall-Team-Space

480_CI_230307_ESC_Big-Axo-Furniture_for_Wall-Team-Space

480_MO_190115_OFF_1-50_1

480_MO_190115_OFF_1-50_1

480_CP_250822_1032_MME_H_PRI

480_CP_250822_1032_MME_H_PRI

480_DR_220708_GEN_Updated_Axos-for-Client

480_DR_220708_GEN_Updated_Axos-for-Client

480_MO_190314_OFF_Esp-Prox_1_20_1

480_MO_190314_OFF_Esp-Prox_1_20_1

480_CP_250822_1717_MME_H_PRI

480_CP_250822_1717_MME_H_PRI

480_CP_250822_1454_MME_H

480_CP_250822_1454_MME_H

480_CP_250718_1742_MME_H

480_CP_250718_1742_MME_H

480_CP_250822_1351_MME_H

480_CP_250822_1351_MME_H

The auditorium, with a capacity of up to 800 spectators, extends to the outside amphitheater. The curved seating arrangement flows continuously from inside to outside, creating a natural blend between these complementary spaces.

480_MO_191025_AUD_Auditorium_1-50_01

480_MO_191025_AUD_Auditorium_1-50_01

480_CO_250204_Auditorium_54

480_CO_250204_Auditorium_54

480_CO_250107_IMG_3589

480_CO_250107_IMG_3589

480_CO_250515_Exterior-Landscaping_5222

480_CO_250515_Exterior-Landscaping_5222

The curved concrete auditorium wall is left in its raw state, like all the ceilings.

480_CI_190819_AUD_Coupe-Perspective

480_CI_190819_AUD_Coupe-Perspective

480_CO_210310_Site_Coffrage-Auditorium_2

480_CO_210310_Site_Coffrage-Auditorium_2

480_CO_210310_Site_Coffrage-Auditorium_1

480_CO_210310_Site_Coffrage-Auditorium_1

480_CO_210401_Auditorium_5

480_CO_210401_Auditorium_5

480_CO_210428_Auditorium_002

480_CO_210428_Auditorium_002

480_CO_210428_Auditorium_001

480_CO_210428_Auditorium_001

480_CO_211126_Site_3

480_CO_211126_Site_3

480_CO_230321_DSC01722-1_Auditorium

480_CO_230321_DSC01722-1_Auditorium

480_VD_221130_MURCOURBEVIEW

Furniture was designed specifically for the auditorium’s diverse functions, offering both traditional seating and arrangements that facilitate casual meetings and spontaneous interactions.

480_CI_190902_AUD_Banq-Bal_H-Back

480_CI_190902_AUD_Banq-Bal_H-Back

480_EV_211215_Team_visit_Preparation_Showroom_13

480_EV_211215_Team_visit_Preparation_Showroom_13

480_CP_250822_1113_MME_H

480_CP_250822_1113_MME_H

Drawings

480_DR_250903_Site-Plan

480_DR_250903_Site-Plan

480_DR_2508_PLN_2_MTG-WHITE

480_DR_2508_PLN_2_MTG-WHITE

480_DR_250828_2010-Coupe_A-A_600

480_DR_250828_2010-Coupe_A-A_600

Team

Facts

Client
Banque Lombard Odier & Cie SA
Planning
Executive Architect: Favre & Guth SA, Les Acacias, Switzerland
Interior Architect (Client zones): Rodolphe Parente Architecture & Design, Paris, France
Structural Engineering (Executive Phase): Nicolas Fehlmann Ingénieurs Conseils SA, Morges, Switzerland
Facade Engineering: Werner Sobek AG, Stuttgart, Germany
MEP Engineering: SRG engineering, Genève, Switzerland
Lighting Designer: Licht Kunst Licht AG, Berlin, Germany
Landscape Architect: Oxalis architectes paysagistes associés Sàrl, Carouge, Switzerland
Specialist / Consulting
Fire Strategy Consulting (Competition): Gruner AG, Basel, Switzerland
Structural Engineering (Competition): ABT Ingenieure, Muttenz, Switzerland
Visualizations: Atelier Aron Lorincz, Budapest, Hungary
Visualizations: Bloom Images, Hamburg, Germany
Acoustical Engineering: Batj, Geneva, Switzerland
Acoustical Engineering: Acouconsult Sàrl, Genève, Switzerland
Acoustical Engineering (Consuting for performing art buildings): Kahle Acoustics,Elsene, Belgium
Analysis of Staff Flows: Citec, Geneva, Switzerland
Energy Concept / Sustainability Consulting: Transsolar Energietechnik GmbH, Tobias Fiedler, Stuttgart, Germany
Professional Kitchen Engineering: ECCP, Lausanne, Switzerland
Stage Technology: Ducks Sceno, Villeurbane, France
Transport / Traffic Engineer: Citec, Geneva, Switzerland
Signage: Intégral Ruedi Baur Paris, Paris, France
Structural Engineering (Concept phase): Thomas Jundt, Civil engineers, Geneva, Switzerland
Building Physician: BrĂĽcker+Ernst, Lucerne, Switzerland
Fire Safety: Ignis Salutem, St-Légier, Switzerland
Building Data
Site Area: 296'889 sqft, 27'582 sqm
Gross floor area (GFA): 766'411 sqft, 71'202 sqm
GFA above ground: 408'005 sqft, 37'905 sqm
GFA below ground: 358'405 sqft, 33'297 sqm
Number of levels: 8
Height: 98 ft, 30 m
Gross volume (GV): 10'036'826 cbft, 284'211 cbm
Facade surface: 142'449 sqft, 13'234 sqm