Herzog & de Meuron
Project
2010-2015
Realization
2012-2015

A new Rhine Front

The masterplan of the Novartis Campus in Basel calls for a uniform building height of 23.5 m. Our office building Asklepios 8 is taller because it is situated at the outermost corner of the campus, where the open expanse of the river Rhine invites a different scale. Other taller buildings may flank the Rhine in future, anchoring the campus in the cityscape of Basel. The orthogonal geometry and volume of the Rhine front relates directly to the streets and squares of the campus behind it.

A high Building, not a High-rise

Asklepios 8 consists of two cubes of almost the same height, placed on top of each other. One is six-story high and 23.5 m tall, corresponding to the height of the neighbouring buildings as defined by the masterplan. The cube on top has seven stories, to compensate the perspectival foreshortening when looking at the building from below or a distance. Between the two cubes, a high open space provides a spacious lounge for a wide spectrum of activities, events, working situations, seminars, etc. By means of cantilever balconies, the two cores further support the spatiality and multifunctionality of this tall room. The distinctive volumetric structure of Asklepios 8 makes it a high building rather than a high-rise that typically repeats identical layers from top to bottom. Despite its height, the new addition to the campus thus relates to the proportions of the neighbouring buildings, which follow the masterplan, and is integrated into the campus project as a whole.

The Exterior: a Façade?

Asklepios 8 does not have a conventional façade. All of the functions of a façade – light and views for users, protection against sun and rain, stability and structure – are equally and actively involved in shaping the exterior of the building. Conventionally, protection against rain and sun and even the structure are assigned a subordinate architectural role. In Asklepios 8, we have integrated all of these functions into a linear and three-dimensional system, whose vertical alignment follows gravity, such as the structure and rainwater. The system is complemented by horizontally cantilevered ceilings that generate an orthogonal fabric and tone down the materiality of the glass.

Innovative and Communicative Collaboration

The office space, available on eleven stories, is extremely attractive due to its exceptional lighting, views and communicative layout. The two freestanding, diagonally placed cores ensure maximum flexibility for users. This expansive in-between zone breaks up the scale of the building and creates a central area with a variety of flexible spaces for innovative and communicative collaboration. Two volumes oriented towards the city and towards the Rhine form niches and galleries with a three-story space in the centre for special events.

Public use Towards the Rhine Promenade

On the side of the building that faces the Rhine, Asklepios 8 is supported by two horizontal volumes that establish a connection on the upper campus level between the two parks located to the south and to the east. On the level of the Rhine Promenade, the two horizontal volumes house a riverside restaurant and café that are open to the public.

Herzog & de Meuron, 2015

362_CP_1505_001_EO_PRI
362_CP_1505_001_EO_PRI
362_CP_1505_003_EO_PRI
362_CP_1505_003_EO_PRI
362_CP_1505_004_EO_PRI
362_CP_1505_004_EO_PRI
362_CP_1503_745_EO_H
362_CP_1503_745_EO_H
362_CP_1505_002_EO_PRI
362_CP_1505_002_EO_PRI
362_CP_1503_713_EO_H
362_CP_1503_713_EO_H
362_CP_1503_714_EO_H
362_CP_1503_714_EO_H
362_CP_1503_758_EO_H
362_CP_1503_758_EO_H
362_CP_1503_726_EO_H
362_CP_1503_726_EO_H
362_CP_1503_724_EO_H
362_CP_1503_724_EO_H
362_CP_1503_731_EO_H
362_CP_1503_731_EO_H
362_CP_1503_730_EO_H
362_CP_1503_730_EO_H
362_CP_1503_751_EO_H
362_CP_1503_751_EO_H
362_CP_1503_705_EO_H
362_CP_1503_705_EO_H
362_CP_1503_706_EO_H
362_CP_1503_706_EO_H
362_CP_1503_708_EO_H
362_CP_1503_708_EO_H
362_CP_1503_728_EO_H
362_CP_1503_728_EO_H
362_CP_1503_703_EO_H
362_CP_1503_703_EO_H
362_CP_1503_720_EO_H
362_CP_1503_720_EO_H
362_CP_1503_702_EO_H
362_CP_1503_702_EO_H

Drawings

362_DR_1503_161_GRAPHIC-SET-CONCEPT
362_DR_1503_161_GRAPHIC-SET-CONCEPT
362_DR_1503_135_GRAPHIC-SET-UG2
362_DR_1503_135_GRAPHIC-SET-UG2
362_DR_1503_144_GRAPHIC-SET-OG1
362_DR_1503_144_GRAPHIC-SET-OG1
362_DR_1503_145_GRAPHIC-SET-OG2
362_DR_1503_145_GRAPHIC-SET-OG2
362_DR_1503_159_GRAPHIC-SET-OG3
362_DR_1503_159_GRAPHIC-SET-OG3
362_DR_1503_147_GRAPHIC SET-OG6
362_DR_1503_147_GRAPHIC SET-OG6
362_DR_1503_148_GRAPHIC-SET-OG7
362_DR_1503_148_GRAPHIC-SET-OG7
362_DR_1503_141_GRAPHIC-SET-SECTION-SOUTH
362_DR_1503_141_GRAPHIC-SET-SECTION-SOUTH
362_DR_1503_140_GRAPHIC-SET-SECTION-WEST
362_DR_1503_140_GRAPHIC-SET-SECTION-WEST

Team

Facts

Client
Novartis International AG
Contractors
Internal Planting: Vogt Landschaftsarchitekten AG, CH, Zürich, Stampfenbachstrasse 57
Internal Plaster Works: Deckenbauer AG, CH, Zürich, 7 Flüelastrasse
Internal Plaster Works: Durlum GmbH, DE, Schopfheim, 5 An der Wiese
Lifts: Schindler Aufzüge AG, Top Range Division, CH, Ebikon, Zugerstrasse 13
External Metalworks: Heinrich Würfel Metallbau GmbH & Co. Betriebs KG, DE, Sontra, Brodbergstraße
External Metalworks: Erne AG, CH, 5080 Laufenburg, Baslerstrasse 5
Fire Gates: Jos. Berchtold AG, CH, Zürich, 2 Naglerwiesenstrasse
Fire Gates: Delta Türsysteme AG, CH, Zürich, 2 Naglerwiesenstrasse
Fire Gates: Jomos Feuerschutz AG, CH, Balsthal, 5 Sagmattstrasse
Fire Protection : Axa Systems GmbH, CH, Gerlafingen, 27 Derendingenstrasse
Internal Floor Finishes: Schreinerei Amschwand AG, CH, Kerns, 1 Chäli
Internal Floor Finishes: AGB Bodenbeläge AG, CH, Strengelbach, 6 Webereiweg
Internal Floor Finishes: Schmitt Natursteinwerk AG, CH, Herisau, 64 Sankt Gallerstrasse
Heating : Allco Allenspach AG, CH, Zeiningen, Römerstrasse 30
Internal Doors: Delta Türsysteme AG, CH, Zürich, 2 Naglerwiesenstrasse
Internal Doors: Record Türautomation GmbH, DE, West, 9 Otto-Wels-Straße
Lighting Fixtures: Regent Beleuchtungskörper AG, CH, Basel, Dornacherstrasse 390
Internal Metalwork: Pfirter, Nyfeler + Partner AG, CH, Muttenz, Gartenstrasse 15
Internal Metalwork: Preiswerk + Esser AG, CH, Pratteln, 10 Hohenrainstrasse
Internal Paint and Lacquer : Dürrenberger Maler AG, CH, Basel, 37 Auf dem Wolf
Internal Plaster Works: Cocoon System AG, CH, Basel, 80 Sankt Johanns-Vorstadt
Internal Plaster Works: Gipsergeschäft CANONICA + LOTTI AG, CH, Frenkendorf, 93 Rheinstrasse
Plumbing Works: Rosenmund Haustechnik AG, CH, Basel, 261 Reinacherstrasse
Flat Roof Coverings: Tecton-Fladag AG, CH, Pratteln, 3 Rütiweg
Signs: Arni AG, CH, Basel, 16 Arlesheimerstrasse
Ventilation : Lippuner EMT AG, CH, Grabs, 84 Werdenstrasse
Concrete Works: Erne AG, CH, 5080 Laufenburg, Baslerstrasse 5
External Screens, Blinds: Warema Schweiz GmbH, CH, Luzern, Staldenhof 1a
Fittings: Kvadrat AG, CH, Zürich, Weberhaus
Internal Special Glazing: Delta Türsysteme AG, CH, Zürich, 2 Naglerwiesenstrasse
Kitchen Fittings and Equipment: Schmocker AG, CH, Interlaken, Dammweg 15

Bibliography

Katharina Marchal: “Raum für Innovation. Bauten für Actelion, Novartis und Roche, Basel.” In: Marko Sauer (Ed.). “Modulor. Hülle und Prozess.” Urdorf, Boll AG, 02.2019. pp. 44-55.

Luis Fernández-Galiano (Ed.): “Arquitectura Viva Monografias. Herzog & de Meuron 2013-2017.” Vol. No. 191-192, Madrid, Arquitectura Viva SL, 12.2016.

Ulrike Jehle-Schulte Strathaus (Ed.): “Herzog & de Meuron. Novartis Campus-Asklepios 8.” Basel, Christoph Merian Verlag, 2015.

Location