Herzog & de Meuron
296_CP_1606_1142_IB_2615

296_CP_1606_1142_IB_2615

296_CP_1606_1195_IB_2811

296_CP_1606_1195_IB_2811

296_CP_1606_946_IB_1823

296_CP_1606_946_IB_1823

296_CP_1606_1499_IB_3471

296_CP_1606_1499_IB_3471

296_CP_1606_1112_IB_2502

296_CP_1606_1112_IB_2502

296_CP_1606_914_IB_1657

296_CP_1606_914_IB_1657

296_CP_1606_1329_IB_3322

296_CP_1606_1329_IB_3322

296_CP_1606_1035_IB_2202

296_CP_1606_1035_IB_2202

296_CP_1606_980_IB_1978

296_CP_1606_980_IB_1978

296_CP_1606_1356_IB_3424

296_CP_1606_1356_IB_3424

296_CP_1606_1191_IB_2799

296_CP_1606_1191_IB_2799

Process

An initial concept is based on the maximum building volume permitted by capacity and solar access regulations. The scaffold-like structure allows for various uses and the cultivation of vertical gardens.

296_DR_0608_004_MAX-ENV

296_DR_0608_004_MAX-ENV

296_MO_0609_012

296_MO_0609_012

296_MO_0606_004

296_MO_0606_004

296_CI_0710_901_14_K

296_CI_0710_901_14_K

A second design proposes placing a horizontal block, structured like a bridge on top of the existing buildings.

296_MO_0905_026_28

296_MO_0905_026_28

296_MO_0905_090

296_MO_0905_090

296_MO_0907_025

296_MO_0907_025

296_MO_0907_054

296_MO_0907_054

296_MO_0910_521_LEONARDO

296_MO_0910_521_LEONARDO

296_MO_0912_021

296_MO_0912_021

296_MO_0910_504

296_MO_0910_504

296_MO_0910_512

296_MO_0910_512

The former police station is one of the most important architectural vestiges of British rule.

296_SI_090324_022_HK_MTG_K

296_SI_090324_022_HK_MTG_K

296_SI_060523_502_K

296_SI_060523_502_K

296_SI_1012_501

296_SI_1012_501

296_PA_1010_501_2courtyards

296_PA_1010_501_2courtyards

296_CI_0712_703_aerial

296_CI_0712_703_aerial

296_SI_0707_003_WY

296_SI_0707_003_WY

296_SI_0606_034_AM

296_SI_0606_034_AM

296_SI_0604_124_HK

296_SI_0604_124_HK

296_SI_0606_021_entrance

296_SI_0606_021_entrance

The final design includes a new passageway that opens up the compound to the surroundings and turns the former prison yard into a plaza, flanked by new buildings facing Arbuthnot Road and Old Bailey Street.

296_DR_1012_505

296_DR_1012_505

296_DR_1007_044_Zoning

296_DR_1007_044_Zoning

296_DR_1211_007_HK_MAIN-PASSAGEWAY-DIAGRAM_K

296_DR_1211_007_HK_MAIN-PASSAGEWAY-DIAGRAM_K

296_DR_1012_502

296_DR_1012_502

296_MO_1010_009

296_MO_1010_009

Volumetric studies for the two new buildings to be inserted within the existing complex. Staircases form unique spaces that can also be used as performance venues.

296_DR_1007_037_AW_Concept-vol

296_DR_1007_037_AW_Concept-vol

296_MO_1106_086_COURTYARD_K

296_MO_1106_086_COURTYARD_K

296_MO_1010_015

296_MO_1010_015

296_MO_1102_087

296_MO_1102_087

296_MO_1012_503

296_MO_1012_503

296_MO_1012_504

296_MO_1012_504

296_CI_1106_144_AW_LAUNDRY-YARD_K

296_CI_1106_144_AW_LAUNDRY-YARD_K

296_CI_1210_072_OBW_stair_A1

296_CI_1210_072_OBW_stair_A1

Aluminum elements for the facades: color, shape and size of the modules are designed to reference the stone walls.

296_RFMT_0000_503_K

296_RFMT_0000_503_K

296_RFMT_0000_504_K

296_RFMT_0000_504_K

296_CI_1106_069_FU-update

296_CI_1106_069_FU-update

296_CI_1104_158_FCD-scale_K

296_CI_1104_158_FCD-scale_K

296_MU_1105_003_FCDUNIT

296_MU_1105_003_FCDUNIT

296_MU_1106_018

296_MU_1106_018

296_MU_1109_501_MOCKUP2_K

296_MU_1109_501_MOCKUP2_K

296_MU_1201_502_K

296_MU_1201_502_K

296_MU_1112_023_REVIEW

296_MU_1112_023_REVIEW

296_MU_140226_030_CASTING

296_MU_140226_030_CASTING

296_MU_141112_037_AW_K

296_MU_141112_037_AW_K

296_DG_110920_004_K

296_DG_110920_004_K

296_CI_1203_036_OBW_ELEVATION_UNFOLD

296_CI_1203_036_OBW_ELEVATION_UNFOLD

The elements of the numerous interventions are poured in situ based on mock-ups; a finish is selected for them that is in keeping with their location.

296_EV_1305_012_Stewards Visit Setup

296_EV_1305_012_Stewards Visit Setup

296_MU_140430_150_AM_K

296_MU_140430_150_AM_K

296_MU_140430_209_AM_K

296_MU_140430_209_AM_K

296_MU_140512_045_K

296_MU_140512_045_K

296_MU_1201_029_AM-Materials-Review

296_MU_1201_029_AM-Materials-Review

296_DR_1604_141_AW-Stair-Concrete-Pour-Sequence-12

296_DR_1604_141_AW-Stair-Concrete-Pour-Sequence-12

296_CO_151123_058_OBW_Site-Update_K

296_CO_151123_058_OBW_Site-Update_K

296_CO_160417_097_OBW_K

296_CO_160417_097_OBW_K

296_CO_150518_003_OVERALL-SITE_AW

296_CO_150518_003_OVERALL-SITE_AW

296_CO_160417_134_SITE-UPDATE_OBW-HQ

296_CO_160417_134_SITE-UPDATE_OBW-HQ

Construction of the complex combining old and new buildings.

296_CO_151123_029_BLK-6-7-STAIR

296_CO_151123_029_BLK-6-7-STAIR

296_CO_160308_001_BARRACKS-BRIDGES

296_CO_160308_001_BARRACKS-BRIDGES

296_CO_151123_044_AW_Facade_Site_Update

296_CO_151123_044_AW_Facade_Site_Update

296_CO_170505_OBW_Ext_007

296_CO_170505_OBW_Ext_007

296_CO_170505_008_AW_K

296_CO_170505_008_AW_K

296_CO_0000_502_IMG_5163_K

296_CO_0000_502_IMG_5163_K

296_CO_170505_AW_Ext_011

296_CO_170505_AW_Ext_011

296_CO_170505_AW_002

296_CO_170505_AW_002

296_CO_170505_007_B-YARD_K

296_CO_170505_007_B-YARD_K

Views and impressions of the Arbuthnot wing.

296_SA_161118_036_AW_K

296_SA_161118_036_AW_K

296_CO_161012_026_AW_K

296_CO_161012_026_AW_K

296_CO_161128_AW_Laundry-Yard_011

296_CO_161128_AW_Laundry-Yard_011

296_CO_170505_002_AW_K

296_CO_170505_002_AW_K

296_CO_150401_043_AW-STAIRS_K

296_CO_150401_043_AW-STAIRS_K

296_CO_160118_037_AW-STAIR_K

296_CO_160118_037_AW-STAIR_K

296_CO_160118_041_AW-STAIR_K

296_CO_160118_041_AW-STAIR_K

Facade and the interior of the Old Bailey wing.

296_CO_160417_061_OBW_K

296_CO_160417_061_OBW_K

296_CO_160504_011_OBW_K

296_CO_160504_011_OBW_K

296_CO_160504_OBW_008

296_CO_160504_OBW_008

296_CO_170508_002_OBW_K

296_CO_170508_002_OBW_K

296_CO_160504_Overview_005

296_CO_160504_Overview_005

296_CO_170505_002_OBW_K

296_CO_170505_002_OBW_K

Drawings

296_DR_090504_003

296_DR_090504_003

296_DG_110920_001_K

296_DG_110920_001_K

296_DR_1012_502

296_DR_1012_502

296_DR_1211_007_HK_MAIN-PASSAGEWAY-DIAGRAM_K

296_DR_1211_007_HK_MAIN-PASSAGEWAY-DIAGRAM_K

296_DR_160708_CPS_PLANS_-1

296_DR_160708_CPS_PLANS_-1

296_DR_160708_CPS_PLANS_0

296_DR_160708_CPS_PLANS_0

296_DR_160708_CPS_PLANS_1

296_DR_160708_CPS_PLANS_1

296_DR_160708_CPS_PLANS_2

296_DR_160708_CPS_PLANS_2

296_DR_160708_CPS_PLANS_3

296_DR_160708_CPS_PLANS_3

296_DR_160708_CPS_PLANS_4

296_DR_160708_CPS_PLANS_4

296_DR_160708_CPS_PLANS_5

296_DR_160708_CPS_PLANS_5

296_DR_160708_CPS_section A

296_DR_160708_CPS_section A

296_DR_160708_CPS_section B

296_DR_160708_CPS_section B

296_DR_160708_CPS_section C

296_DR_160708_CPS_section C

296_DR_160708_CPS_section D

296_DR_160708_CPS_section D

296_DR_160628_CPS_section E

296_DR_160628_CPS_section E

296_DG_110920_004_K

296_DG_110920_004_K

Team

Facts

Client
The Hong Kong Jockey Club, Hong Kong
Planning
Design Consultant: Herzog & de Meuron, Basel, Switzerland
Executive Architect: Rocco Design Architects Ltd., Hong Kong, China
Conservation Architect: Purcell, London, UK
Structural Engineering: Arup, London, UK & Arup, Hong Kong, China
Landscape Architect: AECOM, Hong Kong, China
MEP Engineering: J Roger Preston Ltd., Hong Kong, China
Planning Consultant: Townland Consultants Ltd., Hong Kong, China
Quantity Surveyor: Rider Levett Bucknall Ltd., Hong Kong, China
Specialist / Consulting
Acoustics Engineering: Shen Milsom & Wilke Ltd., Hong Kong, China
AV Consulting: Shen Milsom & Wilke Ltd., Hong Kong, China
Art Advisor: David Elliot, Berlin, Germany
Building Physics Consulting: Transsolar Energietechnik GmbH, Stuttgart, Germany
Environmental & Archeology Consultant: ERM, Hong Kong, China
BEAM+ Sustainability Consultant: Hyder Consulting Ltd., Hong Kong, China
Civil Engineering: Arup, Hong Kong, China
Facade Engineering: Arup, Hong Kong, China
Fire Engineering: Arup, Hong Kong, China
Geotechnical Engineering: Arup, Hong Kong, China
IT Consultant: Arup, Hong Kong, China
Lighting Consulting: Arup, London, UK & Arup, Hong Kong, China
Metallurgist: C M Whittington & Associates Pty Ltd., Melbourne, Australia
Retail Operation Consulting: Knight Frank, Hong Kong, China
Scenography Consulting: dUCKS scéno, Villeurbanne, France
Security Consulting: Arup, Hong Kong, China
Traffic Consulting: MVA, Hong Kong, China
Theater Consulting: Hong Kong Academy of Performing Arts, Hong Kong, China
Wayfinding: Marc & Chantal Design, Hong Kong, China
Arboriculturalist Consulting: Hong Kong University, Hong Kong, China
Contractors
Management Contractor: Gammon Construction Ltd., Hong Kong, China
Demolition Works: YSK2 Engineering Co. Ltd., Hong Kong, China
Stengthening Works to Existing Structure: Shui Wing Engineering Co. Ltd., Hong Kong, China
Historic Buildings Structural Alteration, Underpinning and Strengthening: Yau Lee Construction Co. Ltd., Hong Kong, China
Historic Roofs, Windows and Doors Repair and Replacement: Harvest Century Holdings (HK) Ltd., Hong Kong, China
Historic Buildings Facades Repair: Stonewest Ltd., London, UK
New Buildings Piling & Underpinning Works: Win Win Way Construction Ltd., Hong Kong, China
New Buildings Exposed Concrete Frame including Foundation & Basement Wall: United Soundfair Engineering Co. Ltd., Hong Kong, China
New Buildings Structural Steelwork: Gammon Construction Ltd., Hong Kong, China
New Buildings Facade Construction: Josef Gartner & Co. (HK) Ltd., Hong Kong, China
Aluminium Brick Production: Hycast Metals Pty Ltd., Sydney, Australia
Underground Drainage Works & Utilities: Shui Wing Engineering Co. Ltd., Hong Kong, China
P&D / MVAC / FS Installation: Hsin Chong Aster Building Services Ltd., Hong Kong, China
Electrical Installation: Chat Horn Engineering Ltd., Hong Kong, China
ELV, Security & PA System: Chubb Hong Kong Ltd., Hong Kong, China
IT: Jardine One Solution (HK) Ltd., Hong Kong, China
Feature Light Fittings: Macostar Hong Kong Ltd., Hong Kong, China
Elevators: Otis Elevator Co. (HK) Ltd., Hong Kong, China
Fitting-out Works / Facing Brick & Plaster Repair: Yearfull Contracting Ltd., Hong Kong, China
Fitting-out Works (JC Contemporary Restaurant): Sun Bright Construction Co. Ltd., Hong Kong, China
Sanitary Fittings: Jebsen Building Products Ltd., Hong Kong, China
Ironmongeries: Jardine Engineering Co. Ltd., Hong Kong, China
Soft Landscaping / Tree Compensation Works: Oriental Landscapes Ltd., Hong Kong, China
Hard Landscape & External Works: Marmitar Masonry HK Ltd., Hong Kong, China
Building Data
Site Area: 156'076 sqft, 14'500 sqm
Gross floor area (GFA): 290'625 sqft, 27'000 sqm
Number of levels: 4
Footprint: 146'389 sqft, 13'600 sqm
Length: 459 ft, 140 m
Width: 360 ft, 110 m
Height: 164 ft, 50 m
Links
www.taikwun.hk

Bibliography

Gerhard Mack, Herzog & de Meuron: “Herzog & de Meuron 2005-2007. The Complete Works. Volume 6.” Edited by: Gerhard Mack. Basel, BirkhĂ€user, 2018.

Luis FernĂĄndez-Galiano (Ed.): “Arquitectura Viva Monografias. Herzog & de Meuron 2013-2017.” Vol. No. 191-192, Madrid, Arquitectura Viva SL, 12.2016.

Luis FernĂĄndez-Galiano (Ed.): “Arquitectura Viva MonografĂ­as. Herzog & de Meuron 2005-2013.” Vol. No. 157/158, Madrid, Arquitectura Viva SL, 09.2012.

Location