The Film Academy is to be built at one of China’s most beautiful beaches with its driftwood and rock formations. The architects visit the site with Ai Weiwei.

269_SI_0502_036

269_SI_0502_036

269_EV_0503_015

269_EV_0503_015

269_RFnl_0502_016

269_RFnl_0502_016

269_RFnl_0504_046

269_RFnl_0504_046

Sketches, drawings, and photomontages show the layout of the buildings for the enormously complex brief of the Film Academy.

269_MO_0502_005

269_MO_0502_005

269_MO_0502_007

269_MO_0502_007

269_MO_0502_011

269_MO_0502_011

269_CI_0502_056

269_CI_0502_056

The specified elements are cut out of foam, laid out, and assembled in clusters.

269_MO_050301_048_K

269_MO_050301_048_K

269_MO_050401_104_QIN

269_MO_050401_104_QIN

269_MO_050301_095_K

269_MO_050301_095_K

269_CI_050501_008_REP

269_CI_050501_008_REP

269_CI_050501_009_REP

269_CI_050501_009_REP

269_CI_050501_011_rep

269_CI_050501_011_rep

269_CI_050501_002_rep

269_CI_050501_002_rep

269_MO_050401_06_AERIAL

269_MO_050401_06_AERIAL

Studies on the connections and structural engineering of the individual blocks.

269_DT_050401_502_cores

269_DT_050401_502_cores

269_DR_050501_502_Pile-A_Option_B-2_001

269_DR_050501_502_Pile-A_Option_B-2_001

269_DT_050401_503_CORES_cantelever

269_DT_050401_503_CORES_cantelever

269_MO_0506_070_027-MOb

269_MO_0506_070_027-MOb

269_MO_0506_017_006-MOc

269_MO_0506_017_006-MOc

269_MO_0506_012_005-MOa

269_MO_0506_012_005-MOa

269_MO_0506_071_027-MOb

269_MO_0506_071_027-MOb

269_MO_1502_026-MOc

269_MO_1502_026-MOc

The brief divided into three units; studies on pile A (bottom right) addressing important functions on the coast.

269_DR_0506_501_Masterplan

269_DR_0506_501_Masterplan

269_DR_050501_502_Pile-A_Option_B-2_001

269_DR_050501_502_Pile-A_Option_B-2_001

269_DR_050501_503_Pile-A_Option_B-2_002

269_DR_050501_503_Pile-A_Option_B-2_002

269_DR_0506_504_All-Piles_Option-B-2

269_DR_0506_504_All-Piles_Option-B-2

Cross section of pile A.

269_PA_0504_501_SectElev

269_PA_0504_501_SectElev

Large-scale models. A micro camera provides realistic impressions of the interior.

269_PA_050401_500_3E2F

269_PA_050401_500_3E2F

269_MO_0503_006

269_MO_0503_006

269_MO_0503_004

269_MO_0503_004

269_VD_0504_02m02s

269_VD_0504_02m02s

269_MO_0504_500

269_MO_0504_500

269_MO_050301_509_K

269_MO_050301_509_K

269_MO_0503_502

269_MO_0503_502

The project on concluding the feasibility study.

269_CI_0504_504_south

269_CI_0504_504_south

269_CI_0504_501_bird-eye

269_CI_0504_501_bird-eye

269_CI_0504_502_east-street

269_CI_0504_502_east-street

269_CI_0504_503_CENTER_VOID

269_CI_0504_503_CENTER_VOID

Realization of the Film Academy by Chinese firms without Herzog & de Meuron, but based on their ideas.

269_RFCL_1410_702

269_RFCL_1410_702

269_RFCL_1107_701

269_RFCL_1107_701

269_SI_1001_002

269_SI_1001_002

Team

Facts

In Collaboration With
Ai Weiwei, Beijing, China
Client
Qingdao Omnipresent Culture Development Corporation Limited, Qingdao Economic & Technical Development Zone, China
Planning
Architect Planning: Herzog & de Meuron, Basel, Switzerland
Structural Engineering: WGG Schnetzer Puskas Ingenieure, Heinrich Schnetzer, Basel, Switzerland
Mechanical Engineering: Waldhauser Haustechnik AG, Basel, Switzerland
Building Data
Site Area: 3'659'726 sqft, 340'000 sqm
Gross floor area (GFA): 2'459'335 sqft, 228'480 sqm

Bibliography

Gerhard Mack, Herzog & de Meuron: “Herzog & de Meuron 2005-2007. The Complete Works. Volume 6.” Edited by: Gerhard Mack. Basel, Birkhäuser, 2018.

Luis Fernández-Galiano (Ed.): “Arquitectura Viva. Herzog & de Meuron 1978-2007.” 2nd rev. ed. Madrid, Arquitectura Viva, 2007.

Nobuyuki Yoshida (Ed.): “Architecture and Urbanism. Herzog & de Meuron 2002-2006.” Tokyo, A+U Publishing Co., Ltd., 08.2006

Preparing print view