The Museum der Kulturen Basel goes back to the middle of the nineteenth century. Replacing the Augustinian monastery on the MĂĽnsterhĂĽgel, the classicist building by architect Melchior Berri opened in 1849. The “Universal Museum,” as it was then called, was the city’s first museum building. Designed to house both the sciences and the arts, it now holds one of the most important ethnographic collections in Europe, thanks largely to continuing gifts and bequests. In 1917, with holdings of some 40,000 objects, an extension by architects Vischer & Söhne was added. A second extension was projected in 2001 to accommodate what had, by now, become holdings of some 300,000 objects. Modifications would include an entrance especially for the Museum, thereby giving it a new identity.

Extending the building horizontally would have meant decreasing the size of the courtyard, the SchĂĽrhof. Instead, the Vischer building of 1917 has been given a new roof. Consisting of irregular folds clad in blackish green ceramic tiles, the roof resonates with the medieval roofscape in which it is embedded, while functioning at the same time as a clear sign of renewal in the heart of the neighborhood. The hexagonal tiles, some of them three-dimensional, refract the light even when the skies are overcast, creating an effect much like that of the finely structured brick tiles on the roofs of the old town. The steel framework of the folded roof allows for a column-free gallery underneath, an expressive space that forms a surprising contrast to the quiet, right-angled galleries on the floors below.

Up until now, the Museum der Kulturen and the Naturhistorisches Museum shared the same entrance at Augustinergasse. The former is now accessed directly from MĂĽnsterplatz through the previously inaccessible rear courtyard, the SchĂĽrhof. The courtyard, in its patchwork setting of the backs of medieval buildings, has now become an extension of the MĂĽnsterplatz. Part of the courtyard has been lowered and an expansive, gently inclined staircase leads down to the Museum entrance. Hanging plants and climbing vines lend the courtyard a distinctive atmosphere and, in concert with the roof, they give the Museum a new identity. The courtyard has become a social meeting place for all kinds of Museum activities and celebrations.

The weighty, introverted impression of the building, initially concealing its invaluable contents, is reinforced by the façades, many of whose windows have been closed off, and by the spiral-shaped construction for the hanging vegetation mounted under the eaves of the cantilevered roof above the new gallery. This is countered, however, by the foundation, which is slit open the entire length of the building and welcomes visitors to come in. These architectural interventions together with the vegetation divide the long, angular and uniform Vischer building of 1917 into distinct sections. The white stairs, the roof overhang, the climbing plants, the series of windows in the “piano nobile” and the glazed base lend the courtyard direction and give the building a face.

The windows were closed up not just to enhance the weight and elegance of the building; the additional wall space provided by this measure was equally important. The few remaining openings have been enlarged and now extend to the floor. The window reveals are so deep that they form small alcoves that look out onto the old town.

The sequence of rooms follows the same pattern on all three gallery floors. Only two rooms stand out: on the second floor, directly above the entrance, a large room with windows on one side faces the courtyard. Further up, a ceiling has been removed, creating a two-story room with a narrow window slit, where larger objects in the collection can be displayed. Visitors can look down on this new anchor room from above, much like the room containing the Abelam House, thus also providing orientation within the Museum.

The renovation of the galleries followed similar principles throughout. The older rooms have classicist coffered ceilings; those added later have concrete beams in one direction only. With the goal of restoring the original structure of the rooms, dropped ceilings were removed and technical services integrated as discreetly as possible into existing architectural elements.

Herzog & de Meuron, September 2011

200_CP_111112_879_IB_2424_H
200_CP_111112_879_IB_2424_H
200_CP_120427_723_JL_H
200_CP_120427_723_JL_H
200_CP_110913_721_IB_7764_H
200_CP_110913_721_IB_7764_H
200_CO_101129_502
200_CO_101129_502
200_CP_111112_840_IB_2322_H
200_CP_111112_840_IB_2322_H
200_CO_110620_473
200_CO_110620_473
200_CP_120427_717_JL_H
200_CP_120427_717_JL_H
200_CP_110913_770_IB_7888_H
200_CP_110913_770_IB_7888_H

Process

200_SI_0309_001_muenstert-o
200_SI_0309_001_muenstert-o
200_SI_0112_005_001_RW_PTT
200_SI_0112_005_001_RW_PTT
200_MO_0306_252_1-100
200_MO_0306_252_1-100
200_MO_0202_013_PTT
200_MO_0202_013_PTT
200_MO_0310_020
200_MO_0310_020
200_MO_0306_042_1-100_PTT
200_MO_0306_042_1-100_PTT
200_MO_0112_014_13
200_MO_0112_014_13
200_MO_0601_501_004-MO
200_MO_0601_501_004-MO
200_RFmt_0809_003_ziegel_4
200_RFmt_0809_003_ziegel_4
200_MU_090819_061
200_MU_090819_061
200_MO_0808_006
200_MO_0808_006
200_SA_0905_001
200_SA_0905_001
200_MU_0804_042
200_MU_0804_042
200_MU_091218_809
200_MU_091218_809
200_MU_090724_010
200_MU_090724_010
200_MU_090831_44
200_MU_090831_44
200_MU_091218_813
200_MU_091218_813
200_CO_090902_054
200_CO_090902_054
200_CO_091118_76
200_CO_091118_76
200_CO_091119_35
200_CO_091119_35
200_CO_091119_55
200_CO_091119_55
200_CO_091202_061
200_CO_091202_061
200_CO_091208_088
200_CO_091208_088
200_CO_091214_339
200_CO_091214_339
200_CO_100107_671
200_CO_100107_671
200_CO_100204_0787
200_CO_100204_0787
200_CO_100318_006
200_CO_100318_006
200_CO_1005_065
200_CO_1005_065
200_CO_110118_70
200_CO_110118_70
200_MU_090925_826
200_MU_090925_826
200_CO_110516_081
200_CO_110516_081
200_CO_110620_473
200_CO_110620_473
200_CO_110516_089
200_CO_110516_089
200_CP_120427_723_JL_H
200_CP_120427_723_JL_H
200_CP_111112_840_IB_2322_H
200_CP_111112_840_IB_2322_H

Drawings

200_DR_110905_001_DIAGRAM
200_DR_110905_001_DIAGRAM
200_DR_110905_002_LV0_L
200_DR_110905_002_LV0_L
200_DR_110905_003_LV3
200_DR_110905_003_LV3
200_DR_110905_004_LV4_L
200_DR_110905_004_LV4_L
200_DR_110905_005_ROOF
200_DR_110905_005_ROOF
200_DR_110905_001_S1_AA_L
200_DR_110905_001_S1_AA_L
200_DR_110905_002_S2_BB
200_DR_110905_002_S2_BB
200_DR_110905_003_S3_CC_L
200_DR_110905_003_S3_CC_L
200_DR_110905_004_S4_DD
200_DR_110905_004_S4_DD
200_DT_1003_DET_10_WP_100_A-6050-E00
200_DT_1003_DET_10_WP_100_A-6050-E00
200_DT_1003_DET_10_WP_100_A-6051-E00
200_DT_1003_DET_10_WP_100_A-6051-E00
200_DT_1003_DET_10_WP_100_A-6052-E00
200_DT_1003_DET_10_WP_100_A-6052-E00
200_DT_0911_PREISWERK-ESSER_5_a
200_DT_0911_PREISWERK-ESSER_5_a
200_DT_0911_PREISWERK-ESSER_F05_a
200_DT_0911_PREISWERK-ESSER_F05_a

Team

Facts

Client
Construction lot 1: Stiftung Museum der Kulturen, Basel, Switzerland; Construction lot 2 and 3: Kanton Basel-Stadt; c/o Hochbau- und Planungsamt, Basel, Switzerland
Planning
General Planning: ARGE GP MKB, Basel, Switzerland
Architect Planning: Herzog & de Meuron, Basel, Switzerland
Architect Construction: Proplaning AG Architekten, Basel, Switzerland
Construction Management: Proplaning AG Architekten, Basel, Switzerland
Structural Engineering: ZPF Ingenieure, Basel, Switzerland
HVAC Engineering: Waldhauser Haustechnik AG, Basel, Switzerland
Plumbing Engineering: Aqua Planing, Arlesheim, Switzerland
Electrical Engineering: Herzog Kull Group AG, Basel, Switzerland
Landscape Design: Rapp Infra AG, Basel, Switzerland
Specialist / Consulting
Acoustics Consulting: Martin Lienhard, BĂĽro fĂĽr Bau- und Raumakustik, Langenbruck, Switzerland
Building Physics Consulting: Zimmermann + Leuthe GmbH, Aetigkofen, Switzerland
Civil Engineering: Rapp Infra AG, Basel, Switzerland
Facade / Roofing Consulting: Emmer Pfenninger Partner AG, MĂĽnchenstein, Switzerland
Geometric Consulting: Ammann AG, Basel, Switzerland
Traffic Planning: Rapp Infra AG, Basel, Switzerland
Fire Protection Consulting: Visiotec AG, Allschwil, Switzerland
Safety Consulting: Amstein + Walthert AG, ZĂĽrich, Switzerland
Lighting Consulting: Mati AG, Adliswil, Switzerland
Plant Project: Forster BaugrĂĽn AG, Kerzers, Switzerland
Planting: August KĂĽnzel Landschaftsarchitekten AG, Basel, Switzerland
Building Data
Site Area: 24'810 sqft, 2'305 sqm
Gross floor area (GFA): 68'350 sqft, 6'350 sqm
Net floor area: 57'048 sqft, 5'300 sqm
Number of levels: 5
Footprint: 13'013 sqft, 1'209 sqm
Length: 95 ft, 29 m
Width: 88 ft, 27 m
Height: 36 ft, 11 m
Links
www.mkb.ch

Bibliography

Luis Fernández-Galiano (Ed.): “Arquitectura Viva MonografĂ­as. Herzog & de Meuron 2005-2013.” Vol. No. 157/158, Madrid, Arquitectura Viva SL, 09.2012.

Christoph Heim: “Mit spektakulärem Dach in eine neue Ära. Das Basler Museum der Kulturen öffnet seine Tore wieder.”
In: Moritz Suter (Ed.). “Basler Zeitung. Die Zeitung der Nordwestschweiz.” Basel, Basler Zeitung, 06.09.2011. p. 1; pp. 37-41.

“Eigensinn.” Edited by: Museum der Kulturen Basel. Basel, Self-Publishing Museum der Kulturen, 2011. Vol. No. 1.

“Eigensinn. Von Miss Kumbuk bis Herzog & de Meuron.” Edited by: Museum der Kulturen Basel. Basel, Self-Publishing Museum der Kulturen, 2011. Vol. No. 2.

Herzog & de Meuron: “Museum der Kulturen Basel. Sanierung und Erweiterung. Basel, Schweiz 2001-2010.” In: Museum der Kulturen Basel (Ed.). “Eigensinn. Von Miss Kumbuk bis Herzog & de Meuron.” Basel, Self-Publishing Museum der Kulturen, 2011. Vol. No. 2. pp. 10-17.

Thomas Waldmann: “Mehr Raum und verstärkte Identität.” In: “Basler Zeitung. Die Zeitung der Nordwestschweiz.” Vol. No. 217, Basel, Basler Zeitung, 18.09.2002. p. 27.

Location